Installation and Operation of High Gain Long Period Seismograph Station
Abstract
During this report period, April, 1976, through September, 1976, the White Pine high gain seismograph station was put into routine operation completely calibrated and equated with the other HGLP stations. Personnel from the Albuquerque Seismic Center located the horizontal seismometer transient problem and corrected it. The gain levels and response curves were also set by July. In August, we received a shutdown notice from ARPA and discontinued operation by 30 September 1976. Continued research in two areas is covered in this report and abstracts of two papers which will be presented at the Seismological Society of America meeting in mid-October.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1976
- Accession Number
- ADA123529
Entities
People
- Barbara R. Williams
- Frederick J. Mauk
Organizations
- University of Michigan