Industry Perceptions of the Cost/Schedule Control Systems Criteria (C/ SCSC)
Abstract
The purpose of this study was to determine industry perceptions of the Department of Defense's Cost/Schedule Control Systems Criteria (C/SCSC) and to determine whether or not the original objectives of the C/SCSC have been fulfilled. Interviews were conducted with contractors from highly varied fields of endeavor in order to achieve opinions from a wide spectrum of the defense industry. Responses were analyzed to ascertain what areas require improvement and to form conclusions on the value of the C/SCSC.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1982
- Accession Number
- ADA123825
Entities
People
- Eric H. Worrall
Organizations
- Naval Postgraduate School