Task 3(a)R, Requirements Planning Session Outline.
Abstract
This report outlines activities planned for the Logistics Management System (LMS) Requirements Planning Session scheduled for September 15. The outline is presented in a manner that can be readily applied to any topic area; however, it is assumed that the topic area will be Maintenance Production Management which will build on the results of one of the two topic areas from the Needs Planning Session in July. It is expected that this outline may be revised substantially based on future work and the results of the July sessions.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 12, 1980
- Accession Number
- ADA124177
Entities
Organizations
- Battelle Memorial Institute