Manufacturing Methods and Technology (MM&T) Specifications for Miniature Cathode Ray Tube.

Abstract

Two CRT assemblies for the 3rd Submission of Phase I - Engineering Samples were source-tested, approved, and accepted by NV&EOL. This successfully concluded the Phase I Engineering Sample requirements of the 1-in. MM&T program. TEI began to manufacture CRT assemblies for Phase II - Confirmatory Samples, but placed a hold on production because of inconclusive results during pre-qualification testing. New Five-Position Test Consoles and Test Fixtures became operational. TEI's ATP (Acceptance Test Procedure) was prepared and a draft was submitted to NV&EOL for review and approval. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 31, 1982
Accession Number
ADA124954

Entities

People

  • F. M. Bruno

Tags

Communities of Interest

  • Advanced Electronics
  • Air Platforms

DTIC Thesaurus Topics

  • Acceptance Tests
  • Assembly
  • Cathode Ray Tubes
  • Contracts
  • Electro-Optics
  • Electron Tubes
  • Electronics
  • Engineering
  • Manufacturing
  • Night Vision
  • Production
  • Production Engineering
  • Qualifications
  • Test And Evaluation
  • Test Equipment
  • Test Fixtures

Readers

  • Human-Computer Interaction (HCI).
  • Software Engineering