Manufacturing Methods and Technology (MM&T) Specifications for Miniature Cathode Ray Tube.
Abstract
Two CRT assemblies for the 3rd Submission of Phase I - Engineering Samples were source-tested, approved, and accepted by NV&EOL. This successfully concluded the Phase I Engineering Sample requirements of the 1-in. MM&T program. TEI began to manufacture CRT assemblies for Phase II - Confirmatory Samples, but placed a hold on production because of inconclusive results during pre-qualification testing. New Five-Position Test Consoles and Test Fixtures became operational. TEI's ATP (Acceptance Test Procedure) was prepared and a draft was submitted to NV&EOL for review and approval. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 31, 1982
- Accession Number
- ADA124954
Entities
People
- F. M. Bruno