Smithland Dam, Ohio River. Foundation Report. Volume I. Text, Drawings and Boring Logs.

Abstract

This report presents complete foundation records of conditions encountered during construction and the methods used to adapt the dam structures to these conditions. The report covers the construction of the Smithland Dam and Weir only. The construction for the twin 1200 foot locks is covered under a previous report. The high lift gated section of the dam consists of 12 piers and 11 gated bays. The dam section starts on the Kentucky side of the river-wall of the locks and extends 1400 feet to the Kentucky side of pier 12. A fixed weir consisting of granular filled and concrete capped steel piling cells extends from pier 12 some 1728 feet to the Kentucky bank. Contents (Volume I): Introduction; Foundation Exploration; Geology; Excavation; Caissons; Anchor Rods; Character of Foundation; Foundation Preparation; Fixed Weir; Cofferdam; and Possible Future Problems.

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1983
Accession Number
ADA125056

Entities

People

  • Bryan Moser
  • Rick Schipp

Tags

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Construction Materials
  • Excavation
  • High Lift
  • Kentucky
  • Masonry
  • Ohio River
  • Personality
  • Rivers

Readers

  • Business Analytics
  • Geotechnical Engineering.
  • Hydraulic Engineering.