Optimal Lot-Sizing in Acyclic Multiperiod Production Systems,

Abstract

This paper presents constructive, network-based proofs for the Wagner Whitin property and a generalized Nested Schedule property for optimal production schedules in acyclic hierarchical multiperiod production systems. Algorithms for obtaining schedules with these properties and described and illustrated with examples. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1982
Accession Number
ADA125065

Entities

People

  • L. F. Mcginnis
  • V. V. Rao

Organizations

  • Georgia Tech

Tags

DTIC Thesaurus Topics

  • Accumulators
  • Algorithms
  • Construction
  • Cost Reductions
  • Costs
  • Distributors
  • Engineering
  • Flow Network
  • Graphs
  • Inventory
  • Lead Time
  • Materials
  • Military Research
  • Production
  • Production Engineering
  • Standards
  • Systems Engineering

Readers

  • Operations Research