Optimal Lot-Sizing in Acyclic Multiperiod Production Systems,
Abstract
This paper presents constructive, network-based proofs for the Wagner Whitin property and a generalized Nested Schedule property for optimal production schedules in acyclic hierarchical multiperiod production systems. Algorithms for obtaining schedules with these properties and described and illustrated with examples. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1982
- Accession Number
- ADA125065
Entities
People
- L. F. Mcginnis
- V. V. Rao
Organizations
- Georgia Tech