GREAT I Study of the Upper Mississippi River. Technical Appendixes. Volume 8. Channel Maintenance. Part V. Pool Plans and Site Descriptions - Pools 8, 9, & 10.

Abstract

This section of the Channel Maintenance Plan contains both summarized and detailed information describing GREAT I's selected plan for dredged material placement for various pools. It also contains a qualitative comparison of the selected plan placement sites with other placement sites considered by GREAT I for the pools.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1980
Accession Number
ADA127098

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Agriculture
  • Birds
  • Cost Estimates
  • Costs
  • Cultural Resources
  • Endangered Species
  • Environmental Pollutants
  • Fish
  • Groins (Structures)
  • Habitats
  • Materials
  • Mississippi River
  • Open Water
  • Recreation
  • Water Quality
  • Wildlife

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Riverine Ecology