Manufacturing Methods and Technology (MM&T) Specifications for Miniature Cathode Ray Tube.

Abstract

Improvements in vibration-testing techniques led to the satisfactory performance of CRTs in continuing pre-vibration tests. Pending final approval of its ATP and QTP, TEI was fabricating CRT components preparatory to manufacture and test of phase II - Confirmatory samples. Life testing of the P43 phosphor was successfully concluded.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 31, 1983
Accession Number
ADA127160

Entities

People

  • F. M. Bruno

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Abstracts
  • Aircrafts
  • Assembly
  • Brightness
  • Cathode Ray Tubes
  • Contracts
  • Electron Tubes
  • Electronics
  • Helicopters
  • Life Tests
  • Manufacturing
  • Night Vision
  • Production
  • Production Engineering
  • Sine Waves
  • Specifications
  • Test And Evaluation

Readers

  • Aerospace Test and Evaluation
  • Clinical Trial Research.
  • Human-Computer Interaction (HCI).