Lock & Dam 5, Mississippi River near Minneiska, Minnesota. Reconnaissance Report for Hydropower.

Abstract

This report presents a preliminary evaluation of the addition of hydropower at the existing navigation Lock and Dam 5. The study shows that installation of a hydroplant with a 6,000-kW (kilowatt), 8,400-kW, or 10,800-kW nameplate rating is economical. Pertinent data concerning the site and potential hydropower installations are given. Severe environmental impacts are not necessarily associated with construction of a plant of the sizes investigated despite the proxity of the lock and dam to an environmentally sensitive area. The District Engineer recommends that the Corps of Engineers prepare a feasibility report which can serve as a basis for congressional authorization for hydropower plant construction at lock and dam 5.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1981
Accession Number
ADA129707

Entities

Organizations

  • St. Paul District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Birds
  • Construction
  • Economic Analysis
  • Electrical Equipment
  • Environment
  • Fish
  • Habitats
  • Health Services
  • Medical Personnel
  • Natural Resources
  • United States
  • Water Resources
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Electrical Engineering
  • Hydrologic Risk Analysis and Mitigation.