Manufacturing Methods and Technology (MM&T) Specifications fOr Miniature Cathode Ray Tube.
Abstract
TEI corrected two out-of-spec parameters (detected in the CRT assemblies being processed in preparation for Phase II - Confirmatory Samples) by making minor adjustments to its processing and inspection procedures. The updated ATP and QTP were filed in the Word Processor store and were ready to become the basis of several CDRL items when required. Contract Line Item A003, Drawings, Engineering, and Associated Lists, was submitted in draft form to the COR. Process Specifications were being refined for incorporation into Contract Line Item A002, Type D, Specifications. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 30, 1983
- Accession Number
- ADA131042
Entities
People
- F. M. Bruno