SEABEE Pretest Results of the Joint Logistics-over-the-Shore (LOTS) Test and Evaluation Program.

Abstract

The primary objective was to determine the capability of the Services to use the vessel for deploying selected heavy, outsized LOTS equipment to a site where fixed port facilities do not exist. Of special interest was the loading of a DeLong B barge with a 300-ton capacity crane on it, which is used as a barge- temporary container discharge facility (TCDF). The SEABEE is the only ship with the lift potential to deploy this item.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 07, 1977
Accession Number
ADA131728

Entities

People

  • Andy Green
  • Gerald Holiday
  • Herbert Casey
  • Howard Knight
  • William Sutherland

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Army Personnel
  • Availability
  • Boats
  • Buoyancy
  • Cancellation
  • Clearances
  • Containers
  • Employment
  • Engineering
  • Landing Pads
  • Operations Research
  • Scheduling (Production)
  • Test And Evaluation
  • Test Equipment
  • Virginia
  • Web Browsers

Readers

  • Aerospace Test and Evaluation
  • Naval Architecture and Marine Engineering.