Operating and Support Cost Estimating Guide. Sample Analysis Navy Ship at DSARC II.

Abstract

Operating and Support (O&S) costs for the V/STOL and Spruance class destroyers (DD963) are provided. These figures are compared to the figures presented to the DSARC at Milestone I. Annual operating and support costs of the Air Detachment are not included in this report. The costs growth reflected in both the V/STOL and DD963 class destroyer is due mainly to the rise in POL costs from $1.25 per gal. to $1.32 per gal., plus a slight rise in manpower requirements. The Spruance class destroyer was selected as the baseline due to similarities of most ship systems and size. It does not reflect the system being replaced. The V/STOL destroyer is a new concept to meet expanding commitments.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1980
Accession Number
ADA132440

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircraft Maintenance
  • Aircrafts
  • Algorithms
  • Computations
  • Computer Programs
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Databases
  • Defense Systems
  • Engineering
  • Flight Crews
  • Guidance
  • Maintenance
  • Plastic Explosives
  • Short Takeoff Aircraft
  • Weapons

Readers

  • Life Cycle Cost Analysis
  • Mathematics or Statistics
  • Naval Architecture and Marine Engineering.