Mississippi River: Study of Alternatives for Rehabilitation of Lock and Dam Number 1. Minneapolis, Minnesota. Volume 2. Appendix A. Alternative Plans of Rehabilitation.

Abstract

It is recommended that both the landward lock, the riverward lock and the dam at Lock & Dam no. 1, Minneapolis, Minnesota be completely rehabilitated. Based on studies completed to the date of this report, more detailed studies are required to firmly establish cost estimates, environmental effects, and the construction scheduling necessary to insure the work can be completed in the proposed two year construction period without delaying navigation. This Appendix discusses: Plan 1, Rehabilitation of Landward Lock Without Interruption of Navigation; Plan 2, Rehabilitation of Landward Lock with Temporary Use of Riverward Lock for Navigation; Plan 3, Rehabilitation of Landward Lock with Navigation Closed During Construction; and Plan 4, Rehabilitation of Both Locks Without Interruption of Navigation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1976
Accession Number
ADA134022

Entities

Organizations

  • St. Paul District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Backfills
  • Bulkhead Gates
  • Bulkheads
  • Cathodic Protection
  • Concrete
  • Construction
  • Cost Estimates
  • Department Of Veterans Affairs
  • Electrical Equipment
  • Engineering
  • Excavation
  • Fire Protection
  • Gates
  • Intake Manifolds
  • Mechanical Equipment
  • Steel
  • Walls

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Facility/Structural Engineering.
  • Riverine Ecology