Mississippi River: Study of Alternatives for Rehabilitation of Lock and Dam Number 1. Minneapolis, Minnesota. Volume 4. Appendices G-M.
Abstract
It is recommended that both the landward lock, the riverward lock and the dam at Lock & Dam no. 1, Minneapolis, Minnesota be completely rehabilitated. Based on studies completed to the date of this report, more detailed studies are required to firmly establish cost estimates, environmental effects, and the construction scheduling necessary to insure the work can be completed in the proposed two year construction period without delaying navigation. This appendix covers: environmental quality design; mechanical investigations; electrical features; the central control station and access bridge; coordination with other agencies, and a recreation user survey. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1976
- Accession Number
- ADA134024
Entities
Organizations
- St. Paul District, U.S. Army Corps of Engineers