A Construction Management System Microcomputer Program,

Abstract

A microcomputer program is presented that enables a construction project manager to more effectively manage one or more construction projects. The objective of this construction management system program is to provide a comparison of planned and actual time and cost at any time throughout the project life. The program employs one of the most common network planning methods in use today, the Critical Path Method (CPM). The cost comparisons are obtained by utilizing the cost variance techniques of Pilcher. The program calculates CPM network values for the original planned and the actual networks as they are entered. Then the program compares durations and costs for each activity and provides a cost variance for all actual values that have been entered. A total project time, cost and profit variance is calculated. Also, any activity on the critical path can be crashed, thereby reducing project duration and increasing project direct cost. This program has been developed on an Intertec SuperBrain microcomputer system and is written in Microsoft's BASIC-80 computer programming language. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1983
Accession Number
ADA134066

Entities

People

  • Larry Elkins

Organizations

  • North Carolina State University

Tags

DTIC Thesaurus Topics

  • Analysis Of Variance
  • Artificial Intelligence
  • Civil Engineering
  • Computers
  • Construction
  • Contractors
  • Contracts
  • Critical Path Methods
  • Engineering
  • Instructions
  • Language
  • Materials
  • North Carolina
  • Notation
  • Personal Computers
  • Plastic Explosives
  • System Software

Fields of Study

  • Computer science

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Database Systems and Applications
  • Regression Analysis.