Multiple-Purpose Project, Osage River Basin, Hundred and Ten Mile Creek Kansas, Pomona Lake, Operation and Maintenance Manual. Appendix VII. Construction Foundation Report. Revision.

Abstract

The purpose of this report is to present a complete record of the geology and foundation conditions encountered during construction of Pomona Dam. The report focuses primarily on the foundations of the outlet works, right abutment, and spillway area where the bulk of rock foundations are involved. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1983
Accession Number
ADA135578

Entities

People

  • F. Blanks
  • L. C. Myers
  • R. Dennis
  • V. Anderson

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Air Platforms
  • Autonomy
  • C4I
  • Counter IED

DTIC Thesaurus Topics

  • Backfills
  • Concrete
  • Construction
  • Contractors
  • Contracts
  • Dams
  • Drainage Basins
  • Embankments
  • Engineers
  • Excavation
  • Flood Control
  • Flood Plains
  • Gages
  • Materials
  • Pressure Gages
  • Self Assembly
  • Stilling Basins

Readers

  • Business Analytics
  • Geotechnical Engineering.
  • Hydrologic Risk Analysis and Mitigation.