Santa Ana River Main Stem Including Santiago Creek. Technical Appendixes B, C, D, E and F

Abstract

Appendix B (Hydrology) includes the flood history and the hydrologic characteristics of the Santa Ana River Basin. Appendix C (Hydraulic Design) describes the important parameters of the design work of the project: overflow analysis, drainage considerations, sedimentation, channel capacity, dam spillways and other structures. Appendix D (Geology and Soils) contains the results of geologic, soils and materials studies in the project area. Appendix E (Real Estate) discusses the right-of-way and acquisition costs for the recommended and alternative plans. Appendix F (Design and Cost Estimate) includes design and cost estimates for the Recommended and NED Plans; and the detail design drawings for the project.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1980
Accession Number
ADA136680

Entities

Organizations

  • Los Angeles District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Autonomy

DTIC Thesaurus Topics

  • Birds
  • Concrete
  • Construction
  • Drainage Basins
  • Drops
  • Environment
  • Environmental Protection
  • Flood Control
  • Groundwater
  • Habitats
  • Lepidoptera
  • Reinforced Concrete
  • Riprap
  • Water Conservation
  • Water Resources
  • Water Supplies
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Software Engineering