Feasibility Study: Proposed Wet Park at the Tucson Detention Basin, Pima County, Arizona.
Abstract
The purpose of this report is to study the feasibility of using treated effluent from the Randolph Park Wastewater Treatment Plant to fill and maintain a recreational lake and park located at the Tucson Detention Basin Flood Control Project. The results of the study are used to make future planning and design decisions concerning the Ajo Wet Park Project. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1979
- Accession Number
- ADA136997