Feasibility Study: Proposed Wet Park at the Tucson Detention Basin, Pima County, Arizona.

Abstract

The purpose of this report is to study the feasibility of using treated effluent from the Randolph Park Wastewater Treatment Plant to fill and maintain a recreational lake and park located at the Tucson Detention Basin Flood Control Project. The results of the study are used to make future planning and design decisions concerning the Ajo Wet Park Project. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1979
Accession Number
ADA136997

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Animals
  • Birds
  • Chemical Properties
  • Chemical Synthesis
  • Chemistry
  • Construction
  • Environmental Protection
  • Feasibility Studies
  • Flood Control
  • Groundwater
  • Health Services
  • Plants
  • Plastic Explosives
  • Pumping Stations
  • Water Purification
  • Water Quality
  • Water Resources

Readers

  • Archaeological Resource Survey
  • Environmental Engineering
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.