Multiple Launch Rocket System: A Case Study of Manpower, Personnel and Training Requirements Determination
Abstract
This report describes and analyzes the procedures used to determine Manpower, Personnel, and Training (MPT) requirements for the Multiple Launch Rocket System (MLRS) and related accomplishment of actual MPT events/documents to those called for in the Life Cycle System Management Model (LCSMM). It addresses concerns being raised about the adequacy and timeliness of the Army's MPT requirements determination procedures.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1984
- Accession Number
- ADA137644
Entities
People
- E. H. Birdseye
- F. E. O'connor
- R. L. Fairall