Cleveland Harbor, Ohio Draft Reformulation Phase I General Design Memorandum and Draft Supplement to the Final Environmental Impact Statement. Revision.
Abstract
The report documents the study conducted to determine the feasibility of improving Cleveland Harbor on the interest of commercial navigation. Types of improvements considered included: 1) plans to provide a storm entrance in the Lakefront Harbor; 2) deepening and widening the Old River; 3) deepening the Cuyahoga River; and 4) widening the Cuyahoga River at historically restricted locations. The tentatively selected plan includes deepening and widening the east entrance and deepening the east basin channel in the Lakefront Harbor. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1984
- Accession Number
- ADA139380
Entities
Organizations
- Buffalo District, U.S. Army Corps of Engineers