High Fragmentation Steel Production Process
Abstract
Two heats of HF-1 steel which were purchased and metallurgically characterized in the previous phase of this project were used to determine the efforts of vendor and/or cooling method (used to produce the steel) on the production of the M549 projectile warhead metal parts. Parameters investigated included mult-parting, forging, rough-machining and nosing. The study included the design and development of tooling and forging and machining parameters in attempt at a cost-effective manufacturing process.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1984
- Accession Number
- ADA139728
Entities
People
- C. C. Maccrindle
- J. F. Kane
- R. L. Kivak
- W. Sharpe