National Program for Inspection of Non-Federal Dams. Whist Pond Dam (CT 00102), Naugatuck River Basin, Torrington - Goshen, Connecticut. Phase I Inspection Report.

Abstract

The Whist Pond Dam consists of an earth embankment with a maximum height of 9 feet, and a total length of 1,100 feet including a 17.7 foot long overflow spillway located at the right end of the dam. The outlet works consist of a 12-inch cast iron low level diversion outlet pipe through the dam, controlled by a downstream gate valve. The dam impounds Whist Pond, a storage reservoir for public water supply of the Torrington Water Company. Based on the visual inspection and a review of all available pertinent data, the dam is judged to be in fair condition. The future integrity of the dam can be affected by continued slumping of the rip-rap, roots through the embankment, continued deterioration of the spillway weir and training walls, the lack of a defined spillway discharge channel, and the downstream location of the low level diversion outlet valve. The calculated Test Flood inflow of 175 cfs results in a routed outflow of 65 cfs and 0.4 feet of freeboard. The spillway has a capacity of 100 cfs and is capable of discharging 154 percent of the Test Flood routed outflow.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1980
Accession Number
ADA143049

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Connecticut
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Environmental Protection
  • Failure Analysis
  • Flood Control
  • Floods
  • New England
  • Riprap
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.