East Brimfield Lake, Sturbridge, Massachusetts, Thames River Basin, Quinebaug River Watershed. Drought Contingency Plan.

Abstract

The purpose of this study and report was to develop and set forth a drought contingency plan of operation for East Brimfield Lake that would be responsive to public needs during drought periods and identify possible modifications to project regulation within current administrative and legislative constraints. This evaluation was based on preliminary studies utilizing readily available information. The scope of this drought contingency plan includes a description of existing water supply conditions, the possibility of reallocation of reservoir storage within specified limits, water quality evaluation, discussion of impacts on other project purposes, effects on the environment, and summary and conclusions. East Brimfield Lake can provide up to approximately 3,220 acre-feet (one billion gallons) of reservoir water storage for drought emergency purposes. The water would be suitable for public water supply after standard treatment methods.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1983
Accession Number
ADA143374

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Birds
  • Dams
  • Drainage Basins
  • Environment
  • Eutrophication
  • Fish
  • Fisheries
  • Flood Control
  • Floods
  • Habitats
  • New England
  • Water
  • Water Quality
  • Water Supplies
  • Wildlife

Readers

  • Economics
  • Emergency Management and Homeland Security.
  • Hydraulic Engineering.