National Program for Inspection of Non-Federal Dams. Willimantic Reservoir Dam (CT 00198), Thames River Basin, Mansfield-Windham, Connecticut. Phase I Inspection Report.

Abstract

Willimantic Reservoir Dam is a stone masonry and conrete gravity dam with a full crest spillway constructed about 1885. The dam has a maximum height of 29 feet and is approximately 491 feet in length. The stone masonry and concrete spillway has a total crest length of about 491.0 feet and is divided into two distinct sections that have a difference in elevation of 1.2 feet. The dam is considered to be in GOOD condition. Deficiencies include indication of overtopping potential, limited discharge capacity of the spillway and outlet works, inoperable low level outlet through the spillway, and spalling of the downstream face of the left section of the spillway. The test flood outflow for Willimantic Reservoir Dam is equal to 106,000 CFS (635 CSM) when Mansfield Hollow Reservoir upstream is full and 89,000 CFS (533 CSM) when it is empty. With Mansfield Hollow Reservoir full, the PMF will produce overtopping at Willimantic by 8.6 feet and empty by 6.7 feet. For the purposes of this study, Mansfield Hollow Reservoir was considered empty for the one-half PMF event and no overtopping would result at Willimantic. The maximum spillway discharge at Willimantic Reservoir Dam is equal to 38,125 CFS.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1979
Accession Number
ADA143403

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Connecticut
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Environmental Protection
  • Flood Control
  • Floods
  • Gates
  • New England
  • Pumping Stations
  • Reservoirs
  • Visual Inspection
  • Water Supplies

Readers

  • Hydraulic Engineering.