Drought Contingency Plan, Black Rock Lake Thomaston, Connecticut; Housatonic River Basin, Naugatuck River Watershed.
Abstract
Report develops and sets forth a possible drought contingency plan of operation for Black Rock Lake that would be responsive to public needs during drought periods. Scope of plan includes description of existing water supply, conditions, reservoir storage, water quality evaluation, impacts on other projects and conclusions. This site can provide a maximum water supply reserve of about 500 acre-feet (163 million gallons).
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1983
- Accession Number
- ADA143687
Entities
Organizations
- New England District, U.S. Army Corps of Engineers