Section 32 Program: Streambank Erosion Control Evaluation and Demonstration Work Unit 2 - Evaluation of Existing Bank Protection. Field Inspection of Bank Protection Measures on the Upper Yazoo River,
Abstract
A field inspection was conducted by the U.S. Army Engineer Waterways Experiment Station (WES) personnel on 1-3 June 1977 to observe bank protection measures on the tributaries of the Upper Yazoo River.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1978
- Accession Number
- ADA143701
Entities
People
- S. T. Maynord