Section 32 Program: Streambank Erosion Control Evaluation and Demonstration. Work Unit 2. Evaluation of Existing Bank Protection. Field Inspection of Sites in the Vicksburg District in the Upper Yazoo Basin,

Abstract

Section 32 existing and demonstration sites in the Vicksburg District (LMK) were inspected from 11-13 October 1977 by the U.S. Army Engineer Waterways Experiment Station (WES) evaluation team. These sites were located on the North and South Forks of Tillatoba Creek (Tallahatchie County, Mississippi), Hunter Creek (Tallahatchie Country, Mississippi), and Batupan Bogue (Grenada County, Mississippi).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1978
Accession Number
ADA143839

Entities

People

  • E. A. Dardeau Jr.
  • M. P. Keown

Tags

DTIC Thesaurus Topics

  • Cellulose Fibers
  • Confluence
  • Construction
  • Demonstrations
  • Drainage Basins
  • Engineering
  • Engineers
  • Inspection
  • Leaching
  • Materials
  • Meteorological Data
  • Mississippi
  • Revetments
  • Rivers
  • Sediments
  • Soils
  • Test And Evaluation

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Facility/Structural Engineering.