Effective Date (E-DATE) Model Enhancement (EME).

Abstract

Five enhancements were incorporated into the E-DATE Model to improve its capability to assist the ODCSLOG in evaluation the adequacy the (TAEDP-generated) equipment fill of Army units. The enhancements provided for: a model capability to: a. Create new (unprogramed) units, and fill them with assets form currently programed units. b. Include substitute items of equipment in the rating assets in units and the redistribution of assets among units. c. Adjust the model storage to handle an effectively unlimited number of units. d. Process units identified as conversions in the TAEDP data. e. Develop a user friendly program to assist the user in the operation and control of the model. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1984
Accession Number
ADA144496

Entities

People

  • J. J. Connelly

Organizations

  • Center for Army Analysis

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Army Equipment
  • Availability
  • Computations
  • Computers
  • Conversion
  • Databases
  • Directives
  • Force Structure
  • Logistics
  • Logistics Management
  • Manufacturing
  • Mass Storage
  • Plastic Explosives
  • Self Assembly
  • Specifications
  • Test And Evaluation
  • User Friendly

Readers

  • Life Cycle Cost Analysis
  • Military Logistics and Supply Chain Management
  • Systems Analysis and Design