National Program for Inspection of Non-Federal Dams. Hockanum River Dam (CT 00620), Connecticut River Basin, Vernon, Connecticut. Phase I Inspection Report.

Abstract

The Hockanum River Dam consists of a 28 foot long earth embankment with vertical stone masonry walls on the upstream and downstream faces. A concrete spillway 80 feet in the length extends from the earth embankment to the left abutment. The maximum height of the dam is 37 feet. Based on the visual inspection the Hockanum River Dam appears to be in fair condition. Several trees are growing on the crest and upstream face of the dam. Seepage was observed on the downstream face near the left end of the earth embankment section. There is a hole in the stone masonry about 7 ft. down from the crest of the dam. The visible portion of the spillway and training walls were in poor condition with the concrete having a rough surface due to erosion and spalling. The test flood would overtop the dam by 3.1 feet. The spillway is adequate to pass 38 percent of the test flood outflow without overtopping the dam.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1980
Accession Number
ADA144542

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Connecticut
  • Connecticut River
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Failure Analysis
  • Flood Control
  • Hydropower
  • New England
  • Plastic Explosives
  • Safety
  • Visual Inspection
  • Warning Systems

Fields of Study

  • Geology

Readers

  • Hydrologic Risk Analysis and Mitigation.