National Program for Inspection of Non-Federal Dams. Congamond Lakes Outlet (Middle Pond) (MA 00071), Connecticut River Basin, Southwick, Massachusetts. Phase I Inspection Report.

Abstract

This dam is comprised of two earth embankments with a central twin 8 foot wide concrete box culvert with concrete training walls. The inspection indicated the dam to be in generally good condition. The dam has a size classification of intermediate and a hazard classification of low. The test flood would be one-half the PMF.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1979
Accession Number
ADA145582

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Classification
  • Concrete
  • Construction
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Geotechnical Engineering
  • Inspection
  • Massachusetts
  • Materials
  • New England
  • Trees
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.