National Program for Inspection of Non-Federal Dams. Upper Banjo Pond Dam (MA 00185) Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report.

Abstract

Upper Banjo Pond Dam, Gloucester, Mass., is a concrete slab and buttress dam flanked by earth embankments. The dam is approximately 140 feet long and has a maximum height of 17 feet. The dam is in poor condition and in need of extensive repair work. The dam has been classified in the 'small' size and 'high' hazard categories. A test flood equal to the full PMF was selected.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1979
Accession Number
ADA147156

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Masonry
  • Massachusetts
  • Materials
  • New England
  • Retaining Walls
  • Vegetation
  • Visual Inspection
  • Warning Systems
  • Word Processors

Readers

  • Hydraulic Engineering.