A Field Investigation and Facility Review of Eight Modular Starved-Air Heat Recovery Incinerator Systems.
Abstract
The goal of this project was to verify and augment the technical and cost data on modular incinerators that have been obtained in a previous study. Eight modular starved-air heat recovery incinerator (HRI) facilities ranging from 20 to 110 tons per day were visited. The equipment, facility layout, and operations were observed and photographed. Supervisors, operators, and maintenance personnel were interviewed at length about their experience with the HRI equipment and supporting facilities. To aid in the future development of design guidelines for HRI facilities, an emphasis was placed on documenting operational problems and the modifications involved in solving these problems. Where available, cost information for labor, modifications, spare parts, and consumables (utilities, chemicals, ash disposal, pest control) were obtained.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1984
- Accession Number
- ADA147680
Entities
People
- J. E. Mccourt
- R. B. Gardner
- T. J. Chang