Feasibility Report and Final Environmental Impact Statement, Wisconsin River at Portage, Wisconsin, Feasibility Study for Flood Control. Appendixes.
Abstract
The appendices accompany the main report with develops a flood control plan for the Portage, Wisconsin area, in those areas affected by the Wisconsin River and backwater flooding in the lower reaches of the Baraboo River and Duck Creek. The appendices are: Appendix A--Plan Formulation; Appendix B--Hydrology; Appendix C--Hydraulics; Appendix D--Interior Flood Control; Appendix E--Geotechnical Investigations; Appendix F--Social and Economic Analysis; Appendix G--Cultural and Environmental Resources; Appendix H--Recreation and landscape Beautification; Appendix I--Design and Cost Estimates; Appendix J--Coordination, Public Views, And Correspondence.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1983
- Accession Number
- ADA148351
Entities
Organizations
- St. Paul District, U.S. Army Corps of Engineers