TACOM (Army Tank-Automotive Command) Phase III MICV/GT601/X-300
Abstract
This report summarizes the results of TACOM Phase III Demonstration Testing conducted at the General Motors (GM) proving grounds at Milford, Michigan. Testing was conducted January 4 through 18, March 24 through 30, and completed June 7 through June 9, 1983, under the provisions of Contract DAAE07- 82-C-4109. The purpose of this program was to demonstrate the characteristics of the Garrett GT601 gas turbine engine mated with a Detroit Diesel Allison (DDA) X-300 transmission, without a torque converter, installed in a mechanized infantry combat vehicle (MICV) loaded to 45,000 pounds gross vehicle weight (GVW).
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 31, 1984
- Accession Number
- ADA148594
Entities
People
- A. G. Eckstat