Little River Navigation Project, Horry County, South Carolina and Brunswick County, North Carolina. Revision of Weir System and Jetty Sections. Supplement 1.

Abstract

This supplement presents detailed descriptions, a revised cost estimate and updated benefits reflecting modifications to the channels, jetties, and weir system that had previously been approved in the General Design Memorandum. The proposed plan in this supplement provides for the construction of an upcoast and downcoast jetty, an upcoast and downcoast 650' weir section, two sand dikes, two deposition basins, an inner channel, and a 45 deg flared entrance channel. The proposed plan has the same general alignment as the GDM Plan, but incorporates some significant design improvements.

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1978
Accession Number
ADA149672

Entities

Organizations

  • Charleston District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Construction
  • Continents
  • Cost Estimates
  • Costs
  • Geographic Regions
  • Navigation
  • North Carolina
  • South Carolina

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering