Multiple-Purpose Project, Osage River Basin, Osage River, Missouri. Harry S. Truman Dam & Reservoir Operation and Maintenance Manual. Appendix VII. Volume 1. Construction Foundation Report.

Abstract

The purpose of this report is to provide a record of foundation conditions encountered during construction and methods used to adapt to these conditions during construction. This information is a part of the permanent collection of project engineering data required by Appendix A to ER 1110-1-1801, dated Dec 81. This report deals with construction of the main embankment, the Sterett Creek Dike and the Spillway-Powerhouse. Keywords: Engineering geology, Excavation, Rock, Grout, Reinforced concrete.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1984
Accession Number
ADA154209

Entities

People

  • B. J. Cheatham
  • D. J. Bell
  • R. F. Griffith
  • W. E. Donan

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Counter IED
  • Ground and Sea Platforms
  • Weapons Technologies

DTIC Thesaurus Topics

  • Construction
  • Contractors
  • Dielectric Polymers
  • Elastic Properties
  • Energy Transfer
  • Engineering
  • Engineers
  • Explosives
  • Flood Control
  • Groundwater
  • Materials
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Materials Testing
  • Mechanics
  • Test Methods

Fields of Study

  • Engineering

Readers

  • Business Analytics
  • Hydraulic Engineering.
  • Hydrologic Risk Analysis and Mitigation.