National Program for Inspection of Non-Federal Dams. Merrimack River Basin, Lawrence, Massachusetts, Lawrence Reservoir, MA 00743. Phase I Inspection Report.

Abstract

The 410 ft. by 700 ft., stone lined reservoir which is located near the top of Tower Hill is almost entirely surrounded by an earthfill embankment. The embankment is 1870 ft. long and has a maximum height of 29 ft. There are deficiencies which must be corrected to assure the continued performance of the reservoir and embankment. Generally, both are in good condition.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1979
Accession Number
ADA154333

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Conduits
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Gate Valves
  • Gates
  • Massachusetts
  • Materials
  • New England
  • Safety
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydraulic Engineering.