National Program for Inspection of Non-Federal Dams. Kendall Reservoir Dam MA 00622, Nashua River Basin, Holden, Massachusetts. Phase I Inspection Report.

Abstract

The dam is an earthfill dam located at the northern end of Kendall Reservoir. The dam is about 1120 ft. long and 39 ft. high. The major problems are the deteriorating concrete on the spillway. Generally the dam is considered to be in good condition. It has been classified as high in the hazard category. It is recommended that the City of Worcester employ a qualified engineer to investigate the seepage at the toe of the dam.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1978
Accession Number
ADA154343

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Gates
  • Insensitive Explosives
  • Materials
  • Materials Testing
  • New England
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydraulic Engineering.