National Program for Inspection of Non-Federal Dams. Woods Pond (Valley Mill) Dam (MA 00731), Housatonic River Basin, Lee-Lenox, Massachusetts. Phase I Inspection Report.

Abstract

The dam is a rock-filled timber crib spillway structure 165 ft. in length and a maximum height of 11.9 ft. The visual examination of the dam was limited by the heavy flow of water over the spillway. It was reported by the owner and was somewhat visually evident that the spillway has not been repaired in this area. Therefore, the dam can only be considered in fair condition. The size classification is intermediate with a hazard potential of significant.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1979
Accession Number
ADA154368

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Construction
  • Corporations
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Inspection
  • Massachusetts
  • New England
  • Safety
  • United States
  • Valleys
  • Visual Inspection
  • Warning Systems
  • Water

Readers

  • Hydrologic Risk Analysis and Mitigation.