National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report.

Abstract

The dam is a former mill pond dam about 330 ft. long. It has a maximum height of about 8 ft. Past inspection records and the lack of operating and maintenance procedures, there are several deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It is small in size with a hazard potential of high.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1979
Accession Number
ADA154431

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Climate Change
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Gates
  • Masonry
  • New England
  • Rhode Island
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.