National Program for Inspection of Non-Federal Dams. Leahey (Upper) Reservoir Dam MA 00265, Housatonic River Basin, Lee, Massachusetts. Phase I Inspection Report.

Abstract

The dam is an earthen dam about 610 ft. long and 56 ft. high. The dam is in good condition. Some seepage was observed. The dam is intermediate in size and had a hazard classification of high. An investigation is recommended to determine the source(s) and extent of seepage occuring at the downstream toe.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1979
Accession Number
ADA154479

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Gates
  • Materials
  • New England
  • Safety
  • Terrain
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydrologic Risk Analysis and Mitigation.