National Program for Inspection of Non-Federal Dams. Bigney Pond Dam (MA 00422), Massachusetts-Rhode Island Coastal Basin, Brockton, Massachusetts. Phase I Inspection Report.
Abstract
Bigney Pond Dam is formed by an approximately 180 ft. length of earth embankment confined by vertical atone masonry retaining walls about 11 ft. high. The dam is in good condition. It has a low hazard potential and is small in size. The city of Brockton should implement remedial measures.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1978
- Accession Number
- ADA154498
Entities
Organizations
- New England District, U.S. Army Corps of Engineers