National Program for Inspection of Non-Federal Dams. Farnham Reservoir Dam (MA 00314), Housatonic River Basin, Washington, Massachusetts. Phase I Inspection Report.
Abstract
The dam is a concrete gravity dam 750 ft. long and about 105 ft. high. The dam is in poor condition. It is large in size and has a high hazard potential. Failure of the dam will pose a serious threat to two houses and two water supply structures, as well as access to the road to the dam.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1970
- Accession Number
- ADA154499
Entities
Organizations
- New England District, U.S. Army Corps of Engineers