National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report.

Abstract

Foss Reservoir Dam is a 1640 foot earthfill dam with a maximum height of 29 feet. Although the dam is in good condition, the spillway will not pass the peak test flood outflow without overtopping the dam. The dam has been classified in the intermediate size and high hazard categories. It is recommended that the owner employ a registered professional engineer to conduct a more detailed hydraulic and hydrological study.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1981
Accession Number
ADA154643

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Climate Change
  • Construction
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Massachusetts
  • Materials
  • New England
  • Photographs
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydrologic Risk Analysis and Mitigation.