National Program for Inspection of Non-Federal Dams. Goose Pond Dam (MA 00312). Housatonic River Basin, Tyringham, Massachusetts. Phase I Inspection Report.

Abstract

Goose Pond Dam is about 285 ft. long and 27 ft. high. The facility is considered in fair condition. Based on the intermediate size and high hazard potential, the flood test is the Probable Maximum Flood. Investigations are recommended to determine the stability of the embankment and the effect of seepage.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1979
Accession Number
ADA154653

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Classification
  • Climate Change
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Masonry
  • Massachusetts
  • New England
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.