National Program for Inspection of Non-Federal Dams, McLean Reservoir (MA 00539), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report.

Abstract

The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1979
Accession Number
ADA155333

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Gates
  • Geotechnical Engineering
  • Massachusetts
  • Materials
  • New England
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydraulic Engineering.