National Program for Inspection of Non-Federal Dams. Northampton Reservoir (Upper Dam) (MA 00521), Connecticut River Basin, Whately, Massachusetts. Phase I Inspection Report.

Abstract

This dam is a 940 foot long earth embankment dam with a concrete spillway. It is recommended that the areas of erosion both on the upstream and downstream faces where the abutments and embankment interface be repaired. Surface water in these areas should be redirected to prevent future erosion. The riprap on the upstream face should be extended to the dam's crest. The water exiting from the toe and core wall drains should be directed to a control channel and weir where the flow can be periodically measured. The 20-in capped pipe running beneath the dam to the downstream toe should be uncapped and extended to the lower reservoir. This will prevent the potential of a pressurized pipe (should the outlet gate be left open) from bursting and undermining the dam. Although the spillway can not discharge the test flood without overtopping the dam, the spillway capacity is comparatively large. Because of the hydrologic and safety relationships between this dam and the lower reservoir, it is necessary that future hydrologic studies concerning spillway capacities at either project should simultaneously encompass studies for both projects.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1978
Accession Number
ADA155362

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Embankments
  • Engineers
  • Flood Control
  • Inspection
  • Masonry
  • Massachusetts
  • Materials
  • New England
  • Safety
  • Spillways
  • Surface Waters
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Fluid Mechanics and Fluid Dynamics.
  • Hydrologic Risk Analysis and Mitigation.