National Program for Inspection of Non-Federal Dams. Lake Josephine Dam (ME 00345), Saint John River Basin, Easton, Maine. Phase I Inspection Report.

Abstract

The earthfill structure is about 3500 ft. long, 31 ft. high, and 18 ft. wide. In addition to the main dam, this project has a dike and drainage ditch surrounding the reservoir. It is intermediate in size with a hazard potential of high. No urgent or emergency actions are required for the dam based on the inspection. (Author).

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1981
Accession Number
ADA155371

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Drainage Basins
  • Emergencies
  • Inspection
  • Reservoirs

Readers

  • Hydrologic Risk Analysis and Mitigation.
  • Seismology