National Program for Inspection of Non-Federal Dams. Egypt Reservoir Dam (MA 01063), Housatonic River Basin, Dalton, Massachusetts. Phase I Inspection Report.

Abstract

Egypt Reservoir Dam is an earth embankment dam approximately 370 feet long, with a maximum hydraulic height of 34 feet. There is a 28-foot wide concrete chute spillway at the easterly abutment. The visual inspection indicates that the dam is in poor condition. The concrete spillway works are deteriorated and require major reconstruction. The downstream slope of the embankment shows evidence of instability and requires attention. Because the dam has a small size and high hazard potential classification, the test flood selected is the 1/2 Probable Maximum Flood (1/2 PMF). The test flood inflow for Egypt Reservoir, having a drainage area of 0.85 square miles, was estimated to be 1050 cfs. Effects of reservoir storage would not significantly reduce the test flood. This flow would cause the dam to overtop by about 1/2 foot. Spillway capacity at the low point in the top of the dam is 510 cfs which is 49% of the test flood outflow.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1981
Accession Number
ADA155385

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Classification
  • Climate Change
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineers
  • Flood Control
  • Massachusetts
  • Materials
  • New England
  • Safety
  • Surveillance
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydrologic Risk Analysis and Mitigation.