National Program for Inspection of Non-Federal Dams. Noyes Brook Dam (ME 00347), Saint John River Basin, Limestone, Maine. Phase I Inspection Report.
Abstract
The earthfill embankment is 1000 ft. long and 31 ft. high. The facility was found in good condition. It is small in size with a high hazard classification. No urgent or emergency actions are required for the dam based on this inspection. (Author).
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1981
- Accession Number
- ADA155388
Entities
Organizations
- New England District, U.S. Army Corps of Engineers